Title of article
Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles
Author/Authors
Haji، Babak نويسنده , , Haji، Alireza نويسنده , , Rahmati Tavakol، Ali نويسنده ,
Issue Information
فصلنامه با شماره پیاپی سال 2008
Pages
14
From page
236
To page
249
Abstract
In this paper we consider a single machine system that produces items part of which are
defective. The defective items produced in a time period, consisting of several equal cycles, are
accumulated and are all reworked in the last cycle of this period called the rework cycle. At the
end of the rework cycle the whole process will start all over again.
The first significant objective of this study is that, for the ease of production and resource
planning, the rework cycle has to have the same length as the other cycles. The other objective
is that the number of rework cycles be as small as possible, because of changeover costs needed
for going from normal production to rework as well as special attention required for rework to
satisfy the zero defect criterion. For this system, assuming no shortages are permitted we drive
the total system cost per unit time and obtain the economic batch quantity which minimizes this
total cost.
Journal title
Journal of Industrial and Systems Engineering (JISE)
Serial Year
2008
Journal title
Journal of Industrial and Systems Engineering (JISE)
Record number
1087449
Link To Document