• Title of article

    Implementation of TPM in cellular manufacture

  • Author/Authors

    G. Chand، نويسنده , , B. Shirvani، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2000
  • Pages
    6
  • From page
    149
  • To page
    154
  • Abstract
    A fundamental component of world-class manufacturing (WCM) is that of total productive maintenance (TPM), linked to both total quality management (TQM) and the concepts of continuous-flow manufacturing which are embedded in cellular manufacturing. An investigation was conducted in collaboration with a first tier automotive component supplier to determine the overall equipment effectiveness (OEE) of a semi-automated assembly cell. The big losses associated with equipment effectiveness were also identified. The production output of the cell over the observed period was 26 515. This represents 97% good components, 0.33% scrap and 2.67% rework. The number of stoppages recorded was 156, where the 10 most common causes were identified. The OEE was 62% and the six big losses represent 38% loss of the productive time. Based on the findings, it was recommended that a pilot project to be conducted to implement a TPM programme for the cell and expand it further to the other cells in the factory.
  • Keywords
    Overall equipment effectiveness and just-in-time , World class manufacture , Planned preventive maintenance , Total productive maintenance
  • Journal title
    Journal of Materials Processing Technology
  • Serial Year
    2000
  • Journal title
    Journal of Materials Processing Technology
  • Record number

    1175538