Title of article
Practical crack control during the construction of precast segmental box girder bridges
Author/Authors
Do-Young Moon، نويسنده , , Jongsung Sim ، نويسنده , , Hongseob Oh، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2005
Pages
10
From page
2584
To page
2593
Abstract
Cracks that occurred in the bottom slab of a precast segmental bridge were investigated through a construction sequence analysis, which revealed that the cracks were caused by excessive deformation during temporary post-tensioning while joining the segments. In addition, a parametric study was performed to evaluate the effects of the prestressing sequence, bottom slab thickness, and position of the prestressing anchors. The structural behavior of the girder sections was greatly affected by the thickness of the bottom slab and the position of prestressing anchors, but not by the prestressing sequence. Based on the results, a construction method that prevents the cracks is proposed.
Keywords
FE analysis , PC box girder , Temporary prestressing , Precast segmental bridge , Structural behavior , Construction sequence analysis
Journal title
Computers and Structures
Serial Year
2005
Journal title
Computers and Structures
Record number
1209861
Link To Document