Title of article
Scheduling with a common due-window: Polynomially solvable cases
Author/Authors
Gur Mosheiov، نويسنده , , Assaf Sarig، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
14
From page
1492
To page
1505
Abstract
The single machine scheduling problem to minimize maximum weighted absolute deviations of job completion times from a common due-date, is known to be NP-hard. However, two special cases have been shown to have polynomial time solutions: the case of unit processing time jobs, and the case of due-date assignment for a given job sequence. We extend both cases to a setting of a common due-window. We show that the unit-job problem includes 12 different sub-cases, depending on the size and location of the (given) due-window. Scheduling and due-window assignment for a given job sequence is solved for a single machine, for parallel identical machines and for flow-shops. For each of the above cases, an appropriate special-structured linear program is presented.
Keywords
Earliness–tardiness cost , Scheduling , Linear programming , Common due-window
Journal title
Information Sciences
Serial Year
2010
Journal title
Information Sciences
Record number
1213921
Link To Document