• Title of article

    General flowshop scheduling problem with the sequence dependent setup times: A heuristic approach

  • Author/Authors

    Seyed Amir Mohsen Ziaee، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    10
  • From page
    126
  • To page
    135
  • Abstract
    This paper proposes a new heuristic method for the general flowshop scheduling problem with the due dates and the sequence dependent setup times (SDSTs) where the objective is to minimize the total weighted tardiness. The approach consists of two phases: in the first phase, a permutation sequence is obtained and this sequence is then improved by a non-permutation local search in the next phase. Using some well-known standard benchmark problems, we examine the performance of the proposed algorithm and our computational results indicate that, despite its simplicity, the proposed heuristic approach provides better solutions than some other alternative methods.
  • Keywords
    sequence dependent setup times , Total weighted tardiness , General flowshop scheduling problem , Scheduling , heuristic
  • Journal title
    Information Sciences
  • Serial Year
    2013
  • Journal title
    Information Sciences
  • Record number

    1215837