• Title of article

    A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

  • Author/Authors

    Peyghami، Peyghami نويسنده Department of Applied Mathematics, Tehran, Iran , , Mokhtari، Hadi نويسنده , PhD Candidate of Industrial Engineering, Tehran, Iran , , Aghaie، Abdollah نويسنده ,

  • Issue Information
    فصلنامه با شماره پیاپی 0 سال 2013
  • Pages
    11
  • From page
    177
  • To page
    187
  • Abstract
    Tradeoff between time and cost is an important issue in planning a project. This paper deals with a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT network of project management. All activities are subject to linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is minimized. A single path TCTP is constructed as an optimization problem with decision variables of activity mean durations. We then reformulate the single path TCTP as a cone quadratic program in order to apply polynomial time interior point methods to solve the reformulation. Finally, we develop an iterative algorithm based on Monte Carlo simulation technique and conic optimization to solve general TCTP. The proposed approach has been tested on some randomly generated test problems. The results illustrate the appropriate performance of our new approach.
  • Journal title
    International Journal of Industrial Engineering and Production Research
  • Serial Year
    2013
  • Journal title
    International Journal of Industrial Engineering and Production Research
  • Record number

    1258398