• Title of article

    A heuristic method for RCPSP with fuzzy activity times

  • Author/Authors

    Tarun Bhaskar، نويسنده , , Manabendra N. Pal، نويسنده , , Asim K. Pal، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    10
  • From page
    57
  • To page
    66
  • Abstract
    In this paper, we propose a heuristic method for resource constrained project scheduling problem with fuzzy activity times. This method is based on priority rule for parallel schedule generation scheme. Calculation of critical path in this case requires comparison of fuzzy numbers. Distance based ranking of fuzzy number is used for finding the critical path length and concept of shifting criticality is proposed for some of the special cases. We also propose a measure for finding the non-integer power of a fuzzy number. We discuss some properties of the proposed method. We use an example to illustrate the method.
  • Keywords
    Project scheduling , Time , Fuzzy number , Critical path
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2011
  • Journal title
    European Journal of Operational Research
  • Record number

    1313038