    Multi-level single machine lot-sizing and scheduling with zero lead times

  • Author/Authors

    Hartmut Stadtler، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    12
  • From page
    241
  • To page
    252
  • Abstract
    A pharmaceutical company raised the question whether an increased product portfolio could still be manufactured on the existing machinery. The proportional lot-sizing and scheduling problem (PLSP) seemed to be most appropriate to answer this question. However, although there are papers dealing with a multi-level PLSP none allows a zero lead time offset which is a prerequisite for the case considered here. In this paper we will extend and modify an existing mixed integer linear programming (MIP) model formulation in two ways: first, we will extend the single-level single machine PLSP to a multi-level single machine PLSP (PLSP-ML-SM) with a zero lead time offset. Second, we will describe a new and more compact model formulation incorporating period overlapping setup times and batch size constraints. Based on the real-world application several test instances have been generated to provide insights into those characteristics which make instances of the PLSP-ML-SM difficult to solve by a standard MIP solver.
  • Keywords
    Lot-sizing , Scheduling , PLSP , Lead time , Bill of materials
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2011
  • Journal title
    European Journal of Operational Research
  • Record number

    1313080