Title of article
Revisiting the PERT mean and variance
Author/Authors
José Manuel Herrer?´as-Velasco، نويسنده , , Rafael Herrer?´as-Pleguezuelo، نويسنده , , Johan Rene Van Dorp & Samuel Kotz، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
4
From page
448
To page
451
Abstract
Difficulties with the interpretation of the parameters of the beta distribution let Malcolm et al. (1959) to suggest in the Program Evaluation and Review Technique (PERT) their by now classical expressions for the mean and variance for activity completion for practical applications. In this note, we shall provide an alternative for the PERT variance expression addressing a concern raised by Hahn (2008) regarding the constant PERT variance assumption given the range for an activity’s duration, while retaining the original PERT mean expression. Moreover, our approach ensures that an activity’s elicited most likely value aligns with the beta distribution’s mode. While this was the original intent of Malcolm et al. (1959), their method of selecting beta parameters via the PERT mean and variance is not consistent in this manner.
Keywords
Project scheduling , PERT , Expert judgment , beta distribution
Journal title
European Journal of Operational Research
Serial Year
2011
Journal title
European Journal of Operational Research
Record number
1313126
Link To Document