• Title of article

    Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size

  • Author/Authors

    Susan A. Slotnick، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    10
  • From page
    527
  • To page
    536
  • Abstract
    This paper presents a model of lead-time policies for a production system, such as an integrated steel mill, in which the bottleneck process requires a minimum batch size. An accurate understanding of internal lead-time quotations is necessary for making good customer delivery-date promises, which must take into account processing time, queueing time and time for arrival of the requisite volume of orders to complete the minimum batch size requirement. The problem is modeled as a stochastic dynamic program with a large state space. A computational study demonstrates that lead time for an arriving order should generally be a decreasing function of the amount of that product already on order (and waiting for minimum batch size to accumulate), which leads to a very fast and accurate heuristic. The computational study also provides insights into the relationship between lead-time quotation, arrival rate, and the sensitivity of customers to the length of delivery promises.
  • Keywords
    Manufacturing , Dynamic programming , Lead times , Production
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2011
  • Journal title
    European Journal of Operational Research
  • Record number

    1313136