Title of article
Scheduling of corrugated paper production
Author/Authors
Kazuki Matsumoto، نويسنده , , Hiroyoshi Miwa، نويسنده , , Toshihide Ibaraki، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
11
From page
782
To page
792
Abstract
Corrugated paper is produced by gluing three types of papers of the same breadth. Given a set of orders, we first assign each order to one of the standard breadths, and then sequence those assigned to each standard breadth so that they are continuously manufactured from the three rolls of the specified standard breadth equipped in the machine called corrugator. Here we are asked to achieve multi-goals of minimizing total length of roll papers, total loss of papers caused by the differences between standard breadths and real breadths of the orders, and the number of machine stops needed during production. We use integer programming to assign orders to standard breadths, and then develop a special purpose algorithm to sequence the orders assigned to each standard breadth. This is a first attempt to handle scheduling problems of the corrugator machine.
Keywords
Corrugated paper , Complexity , Scheduling , Integer programming , Contiguous set
Journal title
European Journal of Operational Research
Serial Year
2009
Journal title
European Journal of Operational Research
Record number
1313372
Link To Document