Title of article
Tabu search for discrete–continuous scheduling problems with heuristic continuous resource allocation
Author/Authors
Grzegorz Walig?ra، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
8
From page
849
To page
856
Abstract
Problems of scheduling non-preemptable, independent jobs on parallel identical machines under an additional continuous renewable resource to minimize the makespan are considered. Each job simultaneously requires for its processing a machine and an amount (unknown in advance) of the continuous resource. The processing rate of a job depends on the amount of the resource allotted to this job at a time. The problem is to find a sequence of jobs on machines and, simultaneously, a continuous resource allocation that minimize the makespan. A heuristic procedure for allocating the continuous resource is used. The tabu search metaheuristic to solve the considered problem is presented. The results produced by tabu search are compared with optimal solutions for small instances, as well as with the results generated by simple search methods – multi-start iterative improvement and random sampling for larger instances.
Keywords
Discrete–continuous scheduling problems , Scheduling , Tabu search
Journal title
European Journal of Operational Research
Serial Year
2009
Journal title
European Journal of Operational Research
Record number
1313470
Link To Document