• Title of article

    Generation of a construction planning from a 3D CAD model

  • Author/Authors

    de Vries، نويسنده , , Bauke and Harink، نويسنده , , Jeroen M.J. Knippenberg، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2007
  • Pages
    6
  • From page
    13
  • To page
    18
  • Abstract
    In construction planning practice, increasingly 4D CAD system are applied for construction analysis and communication. Normally the planning expert is responsible for relating building components to construction activities. In this article we describe a method for automated generation of the construction planning. An algorithm is presented that derives the construction order from a solid model of the building. Experiences from a pilot study illustrate the differences between the real planning and the generated planning, and they show the limitations of the current implementation. Finally an outlook is presented on a more advanced planning system that includes contractorʹs specific knowledge for more accurate results.
  • Keywords
    4D CAD , Construction analysis , Automatic planning , construction management
  • Journal title
    Automation in Construction
  • Serial Year
    2007
  • Journal title
    Automation in Construction
  • Record number

    1337786