Title of article
Generation of a construction planning from a 3D CAD model
Author/Authors
de Vries، نويسنده , , Bauke and Harink، نويسنده , , Jeroen M.J. Knippenberg، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
6
From page
13
To page
18
Abstract
In construction planning practice, increasingly 4D CAD system are applied for construction analysis and communication. Normally the planning expert is responsible for relating building components to construction activities. In this article we describe a method for automated generation of the construction planning. An algorithm is presented that derives the construction order from a solid model of the building. Experiences from a pilot study illustrate the differences between the real planning and the generated planning, and they show the limitations of the current implementation. Finally an outlook is presented on a more advanced planning system that includes contractorʹs specific knowledge for more accurate results.
Keywords
4D CAD , Construction analysis , Automatic planning , construction management
Journal title
Automation in Construction
Serial Year
2007
Journal title
Automation in Construction
Record number
1337786
Link To Document