Title of article
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
Author/Authors
Rogalska، نويسنده , , Magdalena and Bo?ejko، نويسنده , , Wojciech and Hejducki، نويسنده , , Zdzis?aw، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
8
From page
24
To page
31
Abstract
This paper deals with construction project scheduling. In the literature on the subject one can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance (LOB) charts and CMP/PERT network planning. The methods take into account several objective functions: the least cost, the least time, limited resources, work priorities, etc., both in the deterministic and probabilistic approach. The paper presents an analysis of the time/cost relationship, performed using time coupling method TCM III. A modified hybrid evolutionary algorithm (HEA) developed by Bożejko and Wodecki (A Hybrid Evolutionary Algorithm for Some Discrete Optimization Problems. IEEE Computer Society, 325–331, 2005) was used for optimization.
Keywords
Hybrid evolutionary algorithm (HEA) , Time coupling methods (TCM) , Time/cost relationship
Journal title
Automation in Construction
Serial Year
2008