• Title of article

    Modularization and assembly algorithm for efficient MEP construction

  • Author/Authors

    Tserng، نويسنده , , H. Ping and Yin، نويسنده , , Y.L. and Jaselskis، نويسنده , , Edward J. and Hung، نويسنده , , Wu-Chueh and Lin، نويسنده , , Yi-Chieh، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    27
  • From page
    837
  • To page
    863
  • Abstract
    This paper presents an algorithm for efficiently designing, fabricating, and constructing the mechanical, electrical, and plumbing (MEP) systems for buildings. MEP facility construction presents numerous challenges related to its complexity, space limitations, and interference with other trades working in confined areas. Besides, schedule delays can easily be caused by the uncontrolled delivery schedule of the components. This research provides a rational planning algorithm which packages large and complex MEP systems into several smaller fabricated components using spatial planning algorithms to increase the efficiency of the installation process, create a safer work environment, improve construction quality and productivity, reduce construction cycle time, and minimize cost. Furthermore, the technique is verified and validated by three experts and a case study is presented to demonstrate the effectiveness of this algorithm.
  • Keywords
    prefabrication , Schedule delay , Space conflict , MEP system
  • Journal title
    Automation in Construction
  • Serial Year
    2011
  • Journal title
    Automation in Construction
  • Record number

    1338354