Title of article
A framework for an automated and integrated project scheduling and management system
Author/Authors
Chen، نويسنده , , Shih-Ming and Griffis، نويسنده , , F.H. (Bud) and Chen، نويسنده , , Po-Han and Chang، نويسنده , , Luh-Maan، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
22
From page
89
To page
110
Abstract
Construction projects are becoming progressively larger and more complex in terms of physical size and cost. Building information modeling (BIM) is being regarded as a revolutionary change for managing the entire lifecycle of a construction project. However, the information provided by BIM cannot fulfill the requirements of on-site project scheduling and management. This paper presents a BIM-based framework with the function of developing the near-optimum schedule plan according to project objectives and project constraints for project scheduling and management. An automated database management system, a schedule simulation system, and a MD (multi-dimensional) CAD model creator provide a reliable platform for the proposed framework. To verify the concept and test the feasibility of this framework, a computer implementation called NDSM (N-Dimensional project Scheduling and Management system) was developed and implemented in a construction project.
Keywords
Project scheduling and management , Building Information Modeling (BIM) , Database management system , MD CAD model , Schedule simulation system
Journal title
Automation in Construction
Serial Year
2013
Journal title
Automation in Construction
Record number
1338687