Title of article
Qualification of independent spent fuel storage installation
Author/Authors
Fischer، Larry E. نويسنده , , Howe، lien نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 1999
Pages
-216
From page
217
To page
0
Abstract
This paper describes the qualification process of a typical independent spent fuel storage installation (ISFST). It provides background information regarding the licensing and history of ISFSIs. It discusses the process for obtaining a general ISFSI license. A typical ISFSI with its dry cask storage system (DCSS) is described. A description is presented of a typical confirmatory action taken on a DCSS to assure adequate qualification and full compliance of the system with Federal regulations. © 1999 Published by Elsevier Science S.A. All rights reserved.
Keywords
Fatigue monitoring , Transient data collection , Pressurized water reactors
Journal title
Nuclear Engineering and Design
Serial Year
1999
Journal title
Nuclear Engineering and Design
Record number
14224
Link To Document