• Title of article

    A two-phase simple model to determine the timing and duration of R&D project tasks

  • Author/Authors

    MEHREZ، ABRAHAM نويسنده , , DAVID، ISRAEL نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    -47
  • From page
    48
  • To page
    0
  • Abstract
    This paper examines the fundamentals of some problems in builderʹs risk insurance for contractors when there are losses involving temporary structures in construction. Several case studies show the practical aspects of insurance claim settlement in such situations. While temporary structures used during construction are technically not covered by the builderʹs risk policy, it nevertheless behooves the contractor to be acquainted with some of the practical aspects of settling claims in case of loss. Also, such matters as loss prevention, deductibles, policy exclusions, and the principles of obtaining insurance on alteration projects are discussed. The paper is based on a speech given by the writer at the ASCE Seminar of the Metropolitan Section Construction Group on February 9, 1998.
  • Keywords
    non-linear mathematical problem , R&D management , concurrent engineering
  • Journal title
    PRODUCTION PLANNING & CONTROL
  • Serial Year
    1999
  • Journal title
    PRODUCTION PLANNING & CONTROL
  • Record number

    15727