Title of article
The impact of order release strategies on the manufacturing performance for shop floor control
Author/Authors
TSUBONE، H. نويسنده , , KUROYA، T. نويسنده , , Matsuura، H. نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1999
Pages
-57
From page
58
To page
0
Abstract
This paper examines the fundamentals of some problems in builderʹs risk insurance for contractors when there are losses involving temporary structures in construction. Several case studies show the practical aspects of insurance claim settlement in such situations. While temporary structures used during construction are technically not covered by the builderʹs risk policy, it nevertheless behooves the contractor to be acquainted with some of the practical aspects of settling claims in case of loss. Also, such matters as loss prevention, deductibles, policy exclusions, and the principles of obtaining insurance on alteration projects are discussed. The paper is based on a speech given by the writer at the ASCE Seminar of the Metropolitan Section Construction Group on February 9, 1998.
Keywords
order release , flow shop , job shop , shop floor control
Journal title
PRODUCTION PLANNING & CONTROL
Serial Year
1999
Journal title
PRODUCTION PLANNING & CONTROL
Record number
15731
Link To Document