• Title of article

    A two-stage hybrid flowshop with uniform machines and setup times

  • Author/Authors

    Huang، نويسنده , , W. and Li، نويسنده , , S.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1998
  • Pages
    19
  • From page
    27
  • To page
    45
  • Abstract
    In this paper, we consider a two-stage hybrid flowshop in a group technology environment. We assume that parts are grouped into families and a major setup is required when a machine at either stage starts to process a new family. While Stage 1 contains a single machine, Stage 2 contains multiple uniform machines. The objective is to minimize the total makespan. The problem is derived from a real company. To solve the problem, we develop two heuristics and eight effective sequencing rules to assign the parts to the machines at both stages. We also present a model to examine the trade-offs between the costs and the speeds of the machines at Stage 2. Extensive computational results are finally presented to compare the two heuristics and to study the impact of the sequencing rules on the makespan.
  • Keywords
    Uniform machines , Makespan , Choice of uniform machines , hybrid flowshop , Group technology
  • Journal title
    Mathematical and Computer Modelling
  • Serial Year
    1998
  • Journal title
    Mathematical and Computer Modelling
  • Record number

    1591005