• Title of article

    A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size

  • Author/Authors

    Danneberg، نويسنده , , D. and Tautenhahn، نويسنده , , T. and Werner، نويسنده , , F.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    26
  • From page
    101
  • To page
    126
  • Abstract
    In this paper, we propose different heuristic algorithms for flow shop scheduling problems, where the jobs are partitioned into groups or families. Jobs of the same group can be processed together in a batch but the maximal number of jobs in a batch is limited. A setup is necessary before starting the processing of a batch, where the setup time depends on the group of the jobs. In this paper, we consider the case when the processing time of a batch is given by the maximum of the processing times of the operations contained in the batch. As objective function we consider the makespan as well as the weighted sum of completion times of the jobs. For these problems, we propose and compare various constructive and iterative algorithms. We derive suitable neighbourhood structures for such problems with batch setup times and describe iterative algorithms that are based on different types of local search algorithms. Except for standard metaheuristics, we also apply multilevel procedures which use different neighbourhoods within the search. The algorithms developed have been tested in detail on a large collection of problems with up to 120 jobs.
  • Keywords
    setup times , Flow shop scheduling , Insertion algorithms , Local search , Multilevel heuristics
  • Journal title
    Mathematical and Computer Modelling
  • Serial Year
    1999
  • Journal title
    Mathematical and Computer Modelling
  • Record number

    1591400