Title of article
Scheduling a two-stage flowshop under makespan constraint
Author/Authors
Dawande، نويسنده , , Milind and Gavirneni، نويسنده , , Srinagesh and Rachamadugu، نويسنده , , Ram، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2006
Pages
12
From page
73
To page
84
Abstract
We consider selecting and sequencing jobs in a two stage flowshop so that the selected jobs are completed before a specified time limit (such as the end of a shift). The objective is to maximize the weighted (reward) sum of the selected jobs. We show that the problem is NP-hard, and present two procedures to find an optimum solution. The first procedure uses dynamic programming, and the second uses mixed integer programming. The integer programming formulation exploits special properties of the problem and solves large instances of the problem. We also develop heuristics and provide worst case performance guarantees. An improvement procedure is also developed. Extensive computational testing shows that our heuristics, when used jointly with the improvement procedure, yield excellent results (providing solutions within 3% of the optimum in an average sense) for both balanced and unbalanced shops.
Keywords
Scheduling , Flowshop , Heuristics , approximation algorithms
Journal title
Mathematical and Computer Modelling
Serial Year
2006
Journal title
Mathematical and Computer Modelling
Record number
1594203
Link To Document