Title of article
An optimal common production cycle time for imperfect production processes with scrap
Author/Authors
Ma، نويسنده , , Wen-Na and Gong، نويسنده , , Dah-Chuan and Lin، نويسنده , , Gary C.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
14
From page
724
To page
737
Abstract
This paper considers the effects of imperfect production processes and the decision on whether and when to implement a screening process for defective items generated during a production run on the Economic Lot Scheduling Problem (ELSP). It is assumed that a process is in control at the beginning of a production run. After a period of production, the process may shift to an out-of-control state at a random time, and consequently produces a fixed percentage of defective items. These defective items cannot be repaired or reworked, and thus must be scrapped with an additional cost. The objective is to determine an optimal common production cycle time that minimizes the expected average cost per unit of time. The bisection method is employed to obtain a near-optimal solution. A closed-form solution is also derived after using an approximation to an exponential function involved in the objective function. Numerical examples are provided to illustrate the derivation of the optimal common production cycle time.
Keywords
Economic lot scheduling problem , Imperfect production process , Screening process , inventory
Journal title
Mathematical and Computer Modelling
Serial Year
2010
Journal title
Mathematical and Computer Modelling
Record number
1597180
Link To Document