    The least-cost hydrogen for Southern California

  • Author/Authors

    Lin، نويسنده , , Zhenhong and Chen، نويسنده , , Chien-Wei and Ogden، نويسنده , , Joan and Fan، نويسنده , , Yueyue، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    6
  • From page
    3009
  • To page
    3014
  • Abstract
    Optimization is applied to identify the least-cost sequence of hydrogen infrastructure build-up in Southern California during 2010–2060. Given an exogenous demand, the model generates temporal and spatial decisions for building a hydrogen infrastructure, in terms of when, where, at what sizes and by what technologies, that minimize the net present value of technology, environment, and fuel accessibility costs. The least-cost sequence is then analyzed with respect to technology deployment, delivered hydrogen cost, capital requirements, subsidy need, subsidy capacity, and CO 2 mitigation. It is found that industrial hydrogen could play a critical role in initiating hydrogen transition, temporally bridged by onsite SMR to central production dominated at first by biomass gasification and later by coal gasification with carbon dioxide capture and storage (CCS). While a non-discounted capital investment of $24.43 billion is needed for the 50-year build-up, a hydrogen price below 3$/kg could pay back the costs in 20 years earning a 10% IRR. If hydrogen is purchased at the current equivalent gasoline price (2.517 $/gallon), the hydrogen industry could potentially provide $4715 as subsidy for each new FCV purchase. With CCS, 50% of 50-year CO 2 emissions could be avoided.
  • Keywords
    optimization , Hydrogen , Dynamic programming , Alternative fuel
  • Journal title
    International Journal of Hydrogen Energy
  • Serial Year
    2008
  • Journal title
    International Journal of Hydrogen Energy
  • Record number

    1654719