    Comparison of windows-based delay analysis methods

  • Author/Authors

    Kao، نويسنده , , Chih-Kuei and Yang، نويسنده , , Jyh-Bin، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2009
  • Pages
    11
  • From page
    408
  • To page
    418
  • Abstract
    Schedule delays often occur in construction projects and result a controversial issue in assessing their impact on total duration. Windows-based delay analysis methods are the most accurate among various analysis methods for identifying and measuring construction schedule delays. These methods are homologous, but are suitable for different delay situations. This study compares four windows-based delay analysis methods to identify their advantages and limitations. The differences in terms of the perspectives of use prerequisite, functional capability, analytical process and accuracy of analysis results are discussed in terms of a simulated case. Study results are helpful for delay analysts in selecting a suitable method among different windows-based delay analysis methods.
  • Keywords
    delay analysis , claims , Schedule analysis , comparison study
  • Journal title
    International Journal of Project Management
  • Serial Year
    2009
  • Journal title
    International Journal of Project Management
  • Record number

    1840114