• Title of article

    A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution

  • Author/Authors

    Wuliang، نويسنده , , Peng and Chengen، نويسنده , , Wang، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2009
  • Pages
    10
  • From page
    600
  • To page
    609
  • Abstract
    The discrete time–cost tradeoff problem (DTCTP) is an important subject in the project scheduling theory and applications. Due to the fact that the resources used in projects in modern enterprises mainly belong to renewable resources, e.g. manpower resources, the general DTCTP is extended to a new multi-mode resource-constrained DTCTP model (MRC-DTCTP). The multi-mode resource-constrained project scheduling problem (MRCPSP) was referred and the renewable resource constraints were added to the general DTCTP. By predefining the resource price, the renewable resources are related to the project costs, including direct cost and indirect cost. Every activity can be executed in the crashing way in which the project direct costs are used to shorten the activity duration. According to the characteristics of the MRC-DTCTP, an improved genetic algorithm for solving it was developed and its effectiveness was verified by compared with the exact algorithm. Finally an entire time–cost tradeoff curve for a project network was drawn through computing project deadline problem, and the advantages of the MRC-DTCTP were investigated based on computation results.
  • Keywords
    genetic algorithm , Planning and Scheduling , Project Management , Discrete time–cost tradeoff
  • Journal title
    International Journal of Project Management
  • Serial Year
    2009
  • Journal title
    International Journal of Project Management
  • Record number

    1840140