    Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model

  • Author/Authors

    Yang، نويسنده , , Jyh-Bin and Yang، نويسنده , , Chi-Cheng and Kao، نويسنده , , Chih-Kuei، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    11
  • From page
    569
  • To page
    579
  • Abstract
    Project delivery method of Build-Operate-Transfer (BOT) increases the commencement probability of public construction works through private investments. Public construction works worldwide that adopt the BOT model as their project delivery method are increasing gradually. Although many BOT projects have been implemented at various stages, some projects encounter major obstacles for advancement. This study attempts to identify the delay causes in various stages of BOT projects. Opinions of BOT participants’ replies are solicited using two questionnaire surveys. Those outcomes are analyzed using by traditional statistical methods and structural equation modeling method. Study results reveal that the stage of ‘negotiation and signing of concession agreement’ is the most essential stage, in which ‘improper contract planning,’ ‘debt problem’ and ‘uncertainty on political issues and government-finished items’ are the most significant delay causes. Identified causes of delay can be used to prevent the postponement of future BOT projects.
  • Keywords
    delay analysis , Build-Operate-Transfer , Public–private partnership , BOT