• Title of article

    Analysing factors affecting delays in Indian construction projects

  • Author/Authors

    Doloi، نويسنده , , Hemanta and Sawhney، نويسنده , , Anil and Iyer، نويسنده , , K.C. and Rentala، نويسنده , , Sameer، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2012
  • Pages
    11
  • From page
    479
  • To page
    489
  • Abstract
    Construction projects in India are experiencing widespread delays. Due to a dramatic shift in the capacity and volume of the Indian construction sector over the last decade, the need of a systematic analysis of the reasons of delays and developing a clear understanding among the industry professionals are highly crucial. Using a selected set of 45 attributes, this research first identified the key factors impacting delay in Indian construction industry and then established the relationship between the critical attributes for developing prediction models for assessing the impacts of these factors on delay. A questionnaire and personal interviews have formed the basis of this research. Factor analysis and regression modelling were used to examine the significance of the delay factors. From the factor analysis, most critical factors of construction delay were identified as (1) lack of commitment; (2) inefficient site management; (3) poor site coordination; (4) improper planning; (5) lack of clarity in project scope; (6) lack of communication; and (7) substandard contract. Regression model indicates slow decision from owner, poor labour productivity, architectsʹ reluctance for change and rework due to mistakes in construction are the reasons that affect the overall delay of the project significantly. These findings are expected to be significant contributions to Indian construction industry in controlling the time overruns in construction contracts.
  • Keywords
    time delay , Regression modelling , Indian construction industry , Factor Analysis
  • Journal title
    International Journal of Project Management
  • Serial Year
    2012
  • Journal title
    International Journal of Project Management
  • Record number

    1840526