Title of article
Reasonable concession period for build-operate-transfer road projects in the Philippines
Author/Authors
Hanaoka، نويسنده , , Shinya and Palapus، نويسنده , , Hazel Perez، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2012
Pages
12
From page
938
To page
949
Abstract
This paper provides a methodology to determine the reasonable concession period that would be advantageous both to the government and the private sector with the impact of risks taken into consideration in the financial evaluation using Monte Carlo simulation and bargaining game theory. The simulation produced a range of concession period for the private sector and government to negotiate. Bargaining game theory was employed in an attempt to find a specific concession period. To demonstrate the applicability of the proposed methodology, two Build-Operate-Transfer (BOT) road projects in the Philippines were used as case studies. The resulting concession period was found to be longer than the actual concession period granted to the private sector indicating the impact of risks in the cash flow. With the proposed methodology, the government could further enhance its policies in processing BOT projects with the end in view of increasing private sector participation in infrastructure development.
Keywords
Concession period , Build-Operate-Transfer , Risk analysis , Road projects , Bargaining game theory
Journal title
International Journal of Project Management
Serial Year
2012
Journal title
International Journal of Project Management
Record number
1840597
Link To Document