Title of article
Reliability Indices Utlization in Combined Heat and Power ( CHP ) Optimal Operation
Author/Authors
Hosseinnia، Hamed نويسنده Department of Electrical Engineering, Urmia University, Urmia, Iran , , Nazarpour، Dariush نويسنده Department of Electrical Engineering, Urmia University, Urmia, Iran , , Rezaei Benam، Masoud نويسنده Department of Electrical Engineering, Sharif University of Technology, Tehran, Iran ,
Issue Information
فصلنامه با شماره پیاپی 31 سال 2014
Pages
6
From page
67
To page
72
Abstract
The reason for using cogeneration more that heat and power separately is that, it is more efficient. In this paper the goal is finding the optimized CHP system utility size and thermal storage considering reliability limits of boiler and grid connected bus. Loss of Load Expectation (LOLE) and Expected energy not supplied (EENS) are considered as two reliability indices to insure the security of operation. Non-sequential Monte Carlo simulation method is introduced to the reliability assessment of CHP, and a normal distribution electrical load model is built to simulate the hourly electrical load. CHP model combined with a two-state reliability model is applied to Monte Carlo simulation method, and results show that the CHP reliability model works well with non-sequential Monte Carlo simulation. Non-Sequential Monte Carlo method is used to generate scenarios. Also in order to reduce computation time and due to the large number of scenarios, a scenario reduction technique is used. GAMS software is used for optimization process.
Journal title
Majlesi Journal of Electrical Engineering
Serial Year
2014
Journal title
Majlesi Journal of Electrical Engineering
Record number
1983772
Link To Document