Title of article
Recent improvements and present status of the Munich accelerator facility
Author/Authors
Münzer، نويسنده , , H and Rohrer، نويسنده , , L and Carli، نويسنده , , W and Hartung، نويسنده , , P and Schnitter، نويسنده , , H and Trinks، نويسنده , , U، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1996
Pages
4
From page
78
To page
81
Abstract
The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Serial Year
1996
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Record number
2173986
Link To Document