• Title of article

    Casing cementing with half warm-up for thermal recovery wells

  • Author/Authors

    Li، نويسنده , , Zifeng، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    5
  • From page
    94
  • To page
    98
  • Abstract
    Thermal recovery is a very common and effective method for producing heavy oil. Casing failure is a very serious problem in thermal recovery wells. In some oilfields, more than 95% of thermal recovery wellʹs casing was failed due to thermal stresses. In the steam injection process, the casing is heated by steam. Change of casing temperature produces thermal stresses in the casing. The casing deforms when stresses exceed yield point of its material. If using conventional cementing technology for thermal recovery wells, the casing deforms due to thermal stresses in steam injection process. Technologies conventional used to protect the casing from failure for thermal recovery wells are ineffective theoretically. Casing cementing with half warm-up for thermal recovery wells refers to heat payzone production casing to a certain temperature and makes it expand in cement slurry solidifying period. Calculations show that casing cementing with half warm-up performs greater safety coefficient during the whole production cycle and no plastic deformation. This technology will be an important method to prolong thermal recovery wellʹs casing life.
  • Keywords
    casing stress , Mathematical model , Thermal Stress , well cementing , steam injection , Casing failure
  • Journal title
    Journal of Petroleum Science and Engineering
  • Serial Year
    2008
  • Journal title
    Journal of Petroleum Science and Engineering
  • Record number

    2219135