Title of article
Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach
Author/Authors
Catalمo، نويسنده , , J.P.S. and Pousinho، نويسنده , , H.M.I. and Mendes، نويسنده , , V.M.F.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
7
From page
524
To page
530
Abstract
This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.
Keywords
hydro scheduling , Mixed-integer quadratic programming , Head-dependency
Journal title
Energy Conversion and Management
Serial Year
2010
Journal title
Energy Conversion and Management
Record number
2335029
Link To Document