Title of article
Short-term forecasting model for aggregated regional hydropower generation
Author/Authors
Monteiro، نويسنده , , Claudio and Ramirez-Rosado، نويسنده , , Ignacio J. and Fernandez-Jimenez، نويسنده , , L. Alfredo، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
8
From page
231
To page
238
Abstract
This paper presents an original short-term forecasting model of the hourly electric power production for aggregated regional hydropower generation. The inputs of the model are previously recorded values of the aggregated hourly production of hydropower plants and hourly water precipitation forecasts using Numerical Weather Prediction tools, as well as other hourly data (load demand and wind generation). This model is composed of three modules: the first one gives the prediction of the “monthly” hourly power production of the hydropower plants; the second module gives the prediction of hourly power deviation values, which are added to that obtained by the first module to achieve the final forecast of the hourly hydropower generation; the third module allows a periodic adjustment of the prediction of the first module to improve its BIAS error. The model has been applied successfully to the real-life case study of the short-term forecasting of the aggregated hydropower generation in Spain and Portugal (Iberian Peninsula Power System), achieving satisfactory results for the next-day forecasts. The model can be valuable for agents involved in electricity markets and useful for power system operations.
Keywords
Hydropower generation , Short-term forecasting
Journal title
Energy Conversion and Management
Serial Year
2014
Journal title
Energy Conversion and Management
Record number
2338502
Link To Document