Title of article
Total hip stem failure due to weld procedure and material selection misuse
Author/Authors
Griza، نويسنده , , S. and Reguly، نويسنده , , A. and Strohaecker، نويسنده , , T.R.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
7
From page
555
To page
561
Abstract
Total hip arthroplasty has been one of the most successful techniques in orthopedics providing good results for long term. The rate of fatigue failure of total hip arthroplasty stem today is very low due to improvements of the technique along many decades. However, any rare case of stem fracture should be treated carefully due to the problems that can result in the revision for the patient. This paper presents failure analysis of three cemented hip stem which experienced fatigue with less than 5 years in use. The failure is associated to design concept which includes a weld procedure at the proximal third of the stem to attach a metallic wire mesh aiming to improve the bonding to the cement mantle. The failure also is associated with the misuse of AISI 316 L as implant material.
Keywords
ISO 5832-1 , AISI 316 L , THA , Fatigue , Weld
Journal title
Engineering Failure Analysis
Serial Year
2010
Journal title
Engineering Failure Analysis
Record number
2338900
Link To Document