Title of article
Underground excavation in Xiaolangdi project in Yellow River
Author/Authors
Guogang، نويسنده , , Xu and Guoyan، نويسنده , , Ma and Qingbo، نويسنده , , Li and Zhifang، نويسنده , , Cui، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2004
Pages
11
From page
129
To page
139
Abstract
The paper summarizes the excavation methodology, based on analysis of the characteristics of the surrounding rock mass, which has been involved in Xiaolangdi multipurpose dam project. Some special support and excavation methods, such as twin side drift and lattice girder, moderate blasting and double-layer mesh to collapsed tunnel and fault zone, are presented.
Keywords
Deformation monitoring , Stability of surrounding rock mass , excavation , Underground tunnels
Journal title
Engineering Geology
Serial Year
2004
Journal title
Engineering Geology
Record number
2345723
Link To Document