Title of article
Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments
Author/Authors
Liang، نويسنده , , Tien-Fu، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
9
From page
8499
To page
8507
Abstract
In real-life situations, the project manager must handle multiple conflicting goals and these conflicting goals are normally fuzzy owing to information is incomplete and unavailable. This study develops a two-phase fuzzy goal programming (FGP) method for solving the project management (PM) decision problems with multiple goals in uncertain environments. The original multi-objective linear programming (MOLP) model designed here attempts to simultaneously minimize total project costs, total completion time and total crashing costs with reference to direct costs, indirect and contractual penalty costs, duration of activities and the constraint of available budget. An industrial case is implemented to demonstrate the feasibility of applying the proposed two-phase FGP method to practical PM decisions. The contribution of this study lies in presenting a fuzzy mathematical programming methodology to fuzzy multi-objective PM decisions, and provides a systematic decision-making framework that facilitates the decision maker to interactively adjust the search direction until the preferred efficient solution is obtained.
Keywords
Fuzzy goal programming , Project Management , multi-objective linear programming , Fuzzy sets
Journal title
Expert Systems with Applications
Serial Year
2010
Journal title
Expert Systems with Applications
Record number
2348576
Link To Document