Title of article
Production capacity planning and scheduling in a no-wait environment with controllable processing times: An integrated modeling approach
Author/Authors
Mokhtari، نويسنده , , Hadi and Abadi، نويسنده , , Isa Nakhai Kamal and Zegordi، نويسنده , , Seyed Hessameddin Zegordi، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
13
From page
12630
To page
12642
Abstract
This paper develops an integrated model between a production capacity planning and an operational scheduling decision making process in which a no-wait job shop (NWJS) scheduling problem is considered incorporating with controllable processing times. The duration of any operations are assumed to be controllable variables based on the amount of capacity allocated to them, whereas in classical NWJS it is assumed that the machine capacity and hence processing times are fixed and known in advance. The suggested problem which is entitled no-wait job shop crashing (NWJSC) problem is decomposed into the crashing, sequencing and timetabling subproblems. To tackle the addressed NWJSC problem, an improved hybrid timetabling procedure is suggested by employing the concept of both non-delay and enhanced algorithms which provides better solution than each one separately. Furthermore, an effective two-phase genetic algorithm approach is devised integrating with hybrid timetabling to deal with the crashing and sequencing components. The results obtained from experimental evaluations support the outstanding performance of the proposed approach.
Keywords
No-wait job shop , Timetabling , Controllable processing times , Capacity Planning , Decomposition approach
Journal title
Expert Systems with Applications
Serial Year
2011
Journal title
Expert Systems with Applications
Record number
2350285
Link To Document