• Title of article

    Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times

  • Author/Authors

    Cheng، نويسنده , , Hui-Miao and Ying، نويسنده , , Kuo-Ching، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    6
  • From page
    15517
  • To page
    15522
  • Abstract
    The flow-line manufacturing cell scheduling problem (FMCSP) with sequence dependent family setup times (SDFSTs) is a topic of great concern for many industrial applications, but under-represented in the research literature. In this study, a two-level iterated greedy (TLIG) heuristic is proposed to minimize makespan of this strongly NP-hard problem. The performance of the proposed TLIG heuristic is compared against eight existing algorithms on a benchmark problem set used in earlier studies. The experimental results reveal that the proposed TLIG heuristic is very effective and efficient at finding near-optimal solutions for FMCSPs with SDFSTs.
  • Keywords
    Scheduling , Sequence dependent family setups , Flow-line manufacturing cell
  • Journal title
    Expert Systems with Applications
  • Serial Year
    2011
  • Journal title
    Expert Systems with Applications
  • Record number

    2350753