• Title of article

    Replenishment run time problem with machine breakdown and failure in rework

  • Author/Authors

    Chiu، نويسنده , , Yuan-Shyi Peter and Chen، نويسنده , , Kuang-Ku and Ting، نويسنده , , Chia-Kuan، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    7
  • From page
    1291
  • To page
    1297
  • Abstract
    This paper studies the optimal replenishment run time for a production system with stochastic machine breakdown and failure in rework. In most real world manufacturing processes, generation of defective items and random breakdown of equipment are inevitable. This research addresses such reliability issues by examining a production system with a Poisson breakdown rate and an imperfect reworking process. When machine breaks down, no-resumption policy is adopted. Under such a policy, the present production run is aborted and will be restarted only when all on-hand inventories are depleted. Mathematical modeling is used. Derivations of production- inventory cost functions and proofs of theorems and proposition are presented, with the objective of determination of the optimal replenishment run time and lot size that minimize the expected costs per unit time. An illustrating example is provided to show its practical usage.
  • Keywords
    production planning and control , optimization , Replenishment run time , Failure in rework , Machine breakdown
  • Journal title
    Expert Systems with Applications
  • Serial Year
    2012
  • Journal title
    Expert Systems with Applications
  • Record number

    2350983