• Title of article

    Combining an alternative multi-delivery policy into economic production lot size problem with partial rework

  • Author/Authors

    Chiu، نويسنده , , Singa Wang and Chiu، نويسنده , , Yuan-Shyi Peter and Yang، نويسنده , , Jyh-Chau، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    6
  • From page
    2578
  • To page
    2583
  • Abstract
    This paper combines an alternative multi-delivery policy into an imperfect economic production quantity (EPQ) model with partial rework, with the purpose of reducing supplier’s stock holding cost. We extend the problem examined by Chiu et al. [Chiu, Y.-S. P, Chiu, S. W., Li, C.-Y., & Ting, C.-K. (2009). Incorporating multi–delivery policy and quality assurance into economic production lot size problem. Journal of Scientific and Industrial Research, 68(6), 505–512] by considering an n + 1 delivery policy in lieu of n multi-delivery plan for the specific EPQ model with partial rework. Under such a policy, an initial delivery of perfect (finished) items is distributed to customer for satisfying product demand during manufacturer’s regular production time and rework time. At the end of rework, fixed quantity n installments of the finished products are delivered to customer at a fixed interval of time. As a result, a closed-form optimal replenishment batch size solution to the problem is obtained. A numerical example with analysis and comparison is provided to show practical usage of the proposed model and demonstrate its significant savings in stock holding cost.
  • Keywords
    Replenishment lot size , EPQ model , Multiple deliveries , Rework , Discontinuous issuing policy , Scrap
  • Journal title
    Expert Systems with Applications
  • Serial Year
    2012
  • Journal title
    Expert Systems with Applications
  • Record number

    2351168