• Title of article

    Carrier and bore tools for 4 in. bent pipes

  • Author/Authors

    David، نويسنده , , O. and Perrot، نويسنده , , Y. and Friconneau، نويسنده , , J.P. and Maisonnier، نويسنده , , D. and Palmer، نويسنده , , J.D. and Galbiati، نويسنده , , L. and Penasa، نويسنده , , M. and Alfillé، نويسنده , , J.P.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2003
  • Pages
    6
  • From page
    123
  • To page
    128
  • Abstract
    Following the ALARA principle, remote handling techniques are developed for ITER maintenance to prevent direct hands-on access on the vacuum vessel components and reduce the personal dose rate. Maintenance of the divertor cassettes will require cutting, welding and non-destructive testing of the water-cooling-pipes. Work performed under the EFDA work program aimed to demonstrate the feasibility to operate with bore tools by means of an innovative carrier concept and to study the associated mechanisms. This paper presents a carrier designed to navigate through 4 in. bent pipes and the results of the test campaigns on the prototypes.
  • Keywords
    Carrier , Bore tools , Bent pipes , ITER
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2003
  • Journal title
    Fusion Engineering and Design
  • Record number

    2351448