Title of article
The upgrade of the DIII–D EC system using 120 GHz ITER gyrotrons
Author/Authors
Callis، نويسنده , , R.W. and Lohr، نويسنده , , J. and Gorelov، نويسنده , , I.A. and Ponce، نويسنده , , D. and Kajiwara، نويسنده , , K. and Tooker، نويسنده , , J.F.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2005
Pages
4
From page
485
To page
488
Abstract
The planned growth in the EC system on DIII–D over the next few years requires the installation of two depressed collector gyrotrons, a high voltage power supply, two low loss transmission lines, and the required support equipment. This new DIII–D EC equipment could be made identical to the ITER EC system requirements. By building the DIII–D hardware to the ITER specifications, it will allow ITER to gain beneficial prototyping experience on a working tokamak, prior to committing to building the hardware for delivery to ITER.
Keywords
cyclotron , Gyrotron , DIII–D
Journal title
Fusion Engineering and Design
Serial Year
2005
Journal title
Fusion Engineering and Design
Record number
2352212
Link To Document