Title of article
Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan’s Barcelona Plant
Author/Authors
Bautista، نويسنده , , Joaqu?´n and Cano، نويسنده , , Alberto and Alfaro-Moctezuma، نويسنده , , Roc?´o، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
10
From page
11001
To page
11010
Abstract
In this paper, we present an extension to the mixed-model sequencing problem with work overload minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The extension is intended to meet the industrial need to sequence various products so that the work required and completed at the workstations over time is as constant as possible. Several approaches are proposed to formulate the problem, giving rise to different models. Four models are selected, and their performances are compared after running the Gurobi solver, using instances from the literature and a case study of the Nissan powertrain plant in Barcelona.
Keywords
Manufacturing , Just-in-Time , Work overload , sequencing , Linear programming , Production mix preservation
Journal title
Expert Systems with Applications
Serial Year
2012
Journal title
Expert Systems with Applications
Record number
2352411
Link To Document