Title of article
Design of the integration interface between the EU HCPB TBM and the ITER TBM port plug including operations for connection
Author/Authors
Neuberger، نويسنده , , Francis H. and Boccaccini، نويسنده , , L.V. and Ihli، نويسنده , , T. and Roccella، نويسنده , , R. and Tesini، نويسنده , , A. and Bede، نويسنده , , O.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
4
From page
1861
To page
1864
Abstract
The integration system for installation of the European Helium Cooled Pebble Bed Test Blanket Module (EU HCPB TBM) in ITER being developed in the frame of the FZK Fusion programme uses three main interfaces to connect the TBM to its sub-systems. This paper describes how the occupation of the ITER hot cell for TBM installation into the port plug can be limited to the essential taking into account the update of the port plug design. The new design allows the dismantling of the radiation shield from the port plug frame. If a new shield is used for each new TBM the operations for connection of interface I between the TBM and shield can be done outside of the ITER hot cell as hands on operation.
Keywords
Interfaces , Integration , Port plug , TBM
Journal title
Fusion Engineering and Design
Serial Year
2008
Journal title
Fusion Engineering and Design
Record number
2355416
Link To Document