Title of article
Overview of the JET ITER-like Wall Project
Author/Authors
Philipps، نويسنده , , V. and Mertens، نويسنده , , Ph. and Matthews، نويسنده , , G.F. and Maier، نويسنده , , H.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
6
From page
1581
To page
1586
Abstract
This paper presents an overview of the R&D activities for the ITER-like Wall (ILW) Project in JET which has been launched in 2005 and will be completed early 2011. A full replacement of the first wall materials in JET will be done to a ITER like wall composition with Be in the main chamber and W in the divertor as foreseen for the second activated phase in ITER. The project is directed to deliver answers to urgent questions on plasma surface interactions such as tritium retention and Be–W behaviour and to provide in general operational experience in steady state and transient conditions with ITER wall materials under relevant geometry and relevant plasma parameters.
Keywords
Tungsten , Plasma wall interaction , Beryllium , JET
Journal title
Fusion Engineering and Design
Serial Year
2010
Journal title
Fusion Engineering and Design
Record number
2356924
Link To Document