• Title of article

    Feasibility of Upper Port Plug tube handling

  • Author/Authors

    Koning، نويسنده , , J.F. and Elzendoorn، نويسنده , , B.S.Q. and Ronden، نويسنده , , D.M.S. and Klinkhamer، نويسنده , , J.F.F. and Biel، نويسنده , , W. and Krasikov، نويسنده , , Y. and Walker، نويسنده , , C.I.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    4
  • From page
    2060
  • To page
    2063
  • Abstract
    Central, retractable tubes are proposed in several Upper Port Plugs (UPPs) designs for ITER, to enable fast exchange of specific components of diagnostics housed in these UPPs. This paper investigates into possible designs to enable the efficient handling of tubes. The feasibility of tube handling is analysed by first reviewing the designs drivers. Several concepts for handling of the tube are proposed, exploring the limits described by the design drivers. Suggestions are presented for tube integration into the UPP design, concerning the tube mounting into the UPP, the load takeover and coping with the thermal elongation. found that the handling of tubes is feasible but still requires a lot of system level integration. Also, the added value of a tube as a feature in an UPP design to the availability of the subsystem the UPP is a part of, is questionable and needs further assessment on ITER system level.
  • Keywords
    Tube , Hot Cell Facility , Handling , SHUT DOWN , Diagnostic , Upper port plug
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2011
  • Journal title
    Fusion Engineering and Design
  • Record number

    2358786