Title of article
Main achievements of the EU HT test programme of ITER primary wall small scale mock ups
Author/Authors
Lorenzetto، نويسنده , , P and Cardella، نويسنده , , A and Chappuis، نويسنده , , P and Daenner، نويسنده , , W and Erskine، نويسنده , , A and Fèbvre، نويسنده , , M and Hofmann، نويسنده , , G and Le Gallo، نويسنده , , P and Stamm، نويسنده , , H and Tنhtinen، نويسنده , , S، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2000
Pages
6
From page
263
To page
268
Abstract
This paper presents the main achievements of the European Home Team (EU HT) test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show very good thermal fatigue performance and operation margin of the ITER primary first wall concept.
Keywords
Fabrication method , ITER primary wall small scale mock ups , EU HT test programme
Journal title
Fusion Engineering and Design
Serial Year
2000
Journal title
Fusion Engineering and Design
Record number
2365813
Link To Document