• Title of article

    A hybrid genetic algorithm to maximize net present value of project cash project scheduling problem with fuzzy parameters

  • Author/Authors

    Fathallahi، F نويسنده , , Naja، A.A نويسنده ,

  • Issue Information
    دوفصلنامه با شماره پیاپی سال 2016
  • Pages
    11
  • From page
    1893
  • To page
    1903
  • Abstract
    Abstract. This paper studies a speci c resource-constrained project scheduling problem under uncertainty. To do so, the problem is investigated in fuzzy environment and the goal is to maximize the net present value of the project cash ows. The problem is rst mathematically formulated. Then, a hybrid Genetic Algorithm is proposed and tuned to solve this NP-hard problem. The performance of the proposed algorithm is evaluated with comparing two well-known metaheuristic algorithms through a set of instances. Finally, comprehensive computational results are illustrated and the results are analyzed and discussed.
  • Keywords
    net present value , uncertainty , Genetic algorithms , Discounted cash , Fuzzy sets
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Serial Year
    2016
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Record number

    2403989