Title of article
A New Fuzzy Hybrid Dynamic Programming for Scheduling Weighted Jobs on Single Machine
Author/Authors
Mirmohseni ، Maedeh - Guangzhou University University , Nasseri ، Hadi - University of Mazandaran , Khaviari ، Mohammad Hossein - Mazandaran University of Science and Technology
Pages
19
From page
97
To page
115
Abstract
In this paper, dynamic programming for sequencing weighted jobs on a single machine to minimizing total tardiness is focused, to significance of fuzzy numbers field, and importance of that for decision makers who are facing on uncertain data, combination of dynamic programming and fuzzy numbers is applied. A random scheduling problem with fuzzy processing times is given and solved. In addition, algorithm consuming time during solving same category problem and different sizes are analyzed that for large problem CPU time usage is extremely unaffordable. Therefore demonstration of nearexact heuristic method such as Genetic Algorithm (GA) appears. In this paper sufficient discussion around solving this kind of problems and their algorithms analysis and a combination between Dynamic Programming (DP) and genetic algorithm as a newly born method is proposed that stand on DP performance and genetic algorithm search power, and finally comparison on the recent developed method has been held. Then this method can deal with realworld problem easily. Thus, decision makers actually can use this modification of dynamic programming for coping with uncrisp problem.
Keywords
Comparing Fuzzy Numbers , Dynamic programming , Genetic Algorithm , scheduling
Journal title
Journal of Applied Research on Industrial Engineering
Serial Year
2017
Journal title
Journal of Applied Research on Industrial Engineering
Record number
2478496
Link To Document